News
The Maharashtra segment of the Mumbai-Ahmedabad High Speed corridor spans 156 km and includes several complex engineering ...
India’s First Bullet Train Project - the Mumbai - Ahmedabad High Speed Rail corridor, spanning across 508 kilometres, will ...
Mumbai: The construction of the Boisar Bullet Train station has reached a significant milestone with the successful casting ...
Under the bullet train project, Boisar station will have a total built-up area of around 17,000 square metres, including ...
The station is being designed to reflect the spirit of speed, with a sleek façade and modern interiors that mirror the ...
India's Mumbai-Ahmedabad High-Speed Rail project reached a major breakthrough after completing more than 300 kilometers of ...
The company stated that as part of the contract, it will implement European Train Control System (ETCS) Level 2-based ...
Special trains from Ahmedabad to Delhi and Mumbai after Air India 171 crash, with 3AC category and specific stops.
Mumbai: The National High-Speed Rail Corporation Limited (NHSRCL) launched the first full-span Pre-Stressed Concrete (PSC) Box Girder in Maharashtra for the Mumbai-Ahmedabad Bullet Train corridor on ...
The first rail level slab casting was completed at the bullet train station at Boisar in Palghar of Maharashtra ...
The under-construction Boisar bullet train station in Palghar district has marked a milestone with the casting of the first rail level slab, the National High-Speed Rail Corporation (NHSRCL) announced ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results