News
According to officials, the newly completed bridge spans 80 meters and is situated between the Boisar and Vapi stations on ...
The Maharashtra segment of the Mumbai-Ahmedabad High Speed corridor spans 156 km and includes several complex engineering ...
India’s First Bullet Train Project - the Mumbai - Ahmedabad High Speed Rail corridor, spanning across 508 kilometres, will ...
Under the bullet train project, Boisar station will have a total built-up area of around 17,000 square metres, including ...
Mumbai: The construction of the Boisar Bullet Train station has reached a significant milestone with the successful casting ...
The station is being designed to reflect the spirit of speed, with a sleek façade and modern interiors that mirror the ...
The company stated that as part of the contract, it will implement European Train Control System (ETCS) Level 2-based ...
Special trains from Ahmedabad to Delhi and Mumbai after Air India 171 crash, with 3AC category and specific stops.
The first rail level slab casting was completed at the bullet train station at Boisar in Palghar of Maharashtra ...
Mumbai: The National High-Speed Rail Corporation Limited (NHSRCL) launched the first full-span Pre-Stressed Concrete (PSC) Box Girder in Maharashtra for the Mumbai-Ahmedabad Bullet Train corridor on ...
The under-construction Boisar bullet train station in Palghar district has marked a milestone with the casting of the first rail level slab, the National High-Speed Rail Corporation (NHSRCL) announced ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results