News
The much anticipated expansion of the Hampton Roads Bridge-Tunnel remains on pace for completion in August 2027.
Drivers traveling from Hampton to Norfolk on Interstate 64 will soon notice a new traffic pattern at the entrance of the Hampton Roads Bridge-Tunnel.
HAMPTON, Va. (WAVY) — A significant traffic shift at the entrance of the Hampton Roads Bridge-Tunnel began overnight, as part of the HRBT’s major expansion project.
The latest traffic shift around the Hampton Roads Bridge-Tunnel (HRBT) project is in place. It began Sunday night when traffic was reduced to two lanes headed eastbound between Rip Rap and ...
HAMPTON, Va. - The latest traffic shift near the Hampton Roads Bridge-Tunnel (HRBT) is in place. It began Sunday night when traffic was reduced to two lanes headed eastbound between Rip Rap and ...
I-64 East at the Hampton Roads Bridge-Tunnel has reopened at reduced speed after Virginia Department of Transportation construction caused backups and lane closures Friday afternoon.
Results that may be inaccessible to you are currently showing.
Hide inaccessible results